|
Program of conference
6th Forum of Rail Transport in Bratislava, March 16 - 17, 2010, Radisson SAS Carlton Hotel, Bratislava
Program is being updated. Thank you for your understanding.
| March 16, 2010 |
| |
|
|
| 09:00 - 10:00 |
|
Registration with refreshment |
| 10:00 - 10:30 |
|
Opening the conference, speech of honorary guests |
| |
|
|
| 10:30 - 12:30 |
|
BLOCK A1 (Harmony Hall)
Transportation policy and development of railway transport infrastructure in EU and in Slovakia, regional planning |
| |
|
• Planning and Operation Support for Port Hinterland Traffic with Modern Methods (Thomas Siefer, TU Braunschweig, D; Alfons Radtke, IVEMBH, D)
• Execution of the Act No. 24/2006 Coll. on environment impact assessment within rail constructions in context of European Union law (Milan Luciak, Daniela Žišková, MŽP SR, SK)
• Modernization and logistics of bulk substrate transship in railway station Čierna nad Tisou (Marián Frko, BUDAMAR LOGISTICS, a.s., DURBAN, a.s., SK)
• SETA-Axis - the missing Link from the CENTROPE region to the Northern Adriatic Ports (Csaba Szekely, GYSEV, H) (Heinrich Wedral, European Affairs and Statistics, A)
• Embakment special foundation on plastic micropiles with spreading high-strenght geosyntetic within high speed line in section Nové Mesto nad Váhom - Púchov (Branislav Prelovský, EUROGABIONS, s.r.o., František Malík, Cofra - Chemia, s.r.o., SK)
• Video "Railway bridge in Trenčín" (Ján Špánik, REMING CONSULT a.s., SK)
• DISCUSSION |
| |
|
|
| 12:30 - 13:30 |
|
Lunch break |
| |
|
|
| |
|
SECTION I |
| |
|
|
| 13:30 - 15:30 |
|
BLOCK B1 (Harmony Hall)
Modernization of conventional tracks and conditions for development of high speed tracks |
| |
|
• Possibilities of applying PPP in railway infrastructure (Ľudovít Mičinský, Asociácia PPP, SK)
• Modernization of railway station Púchov (Jozef Nižňan, REMING CONSULT, a.s., SK)
• Modernization of railway track in section Krompachy - Kysak (Ján Tóth, SUDOP KOŠICE, a.s., SK)
• Modernizácia trate Votice - Benešov u Prahy (Libor Mařík, IKP Consulting Engineers, s.r.o., CZ)
• Modernization of railway track Žilina - Košice, track section Liptovský Mikuláš - Poprad - Tatry (excluded) (Karol Dobosz, REMING CONSULT, a.s., SK)
• Modernization of railway track Žilina - Košice, track section Liptovský Mikuláš - Poprad - Tatry (excluded) - Krompachy, Documentation for territorial decision (Ján Bušovský, Pavol Gálik, PRODEX, spol. s r.o., SK)
• Efectivity of noise barriers of aluminium (Leopold Dietl, Forster, A)
• DISCUSSION |
| |
|
|
| 15:30 - 15:50 |
|
Break with refreshment |
| |
|
|
| 15:50 - 17:50 |
|
BLOCK C1 (Harmony Hall)
Interoperability in railway transport |
| |
|
• Preparation of new regulations for railway tunnels (Marek Šúň, Basler & Hofmann Slovakia s.r.o., SK)
• Strenght tests within operability (František Bruna, Juraj Sloboda, Výskumný ústav dopravný, a.s., Žilina, SK)
• Implementation of TSI TAF requirements for interoperability in IS infrastructure register (Marta Pustaiova, Železničné telekomunikácie Bratislava, ŽSR, SK)
• Technical specification of infrastructure - issues of practical application and role of infrastructure manager in migartion process (Miroslav Ďurkovský, Výskumný a vývojový ústav železníc, ŽSR, SK)
• Track vehicles in term of setting and implementation of TSI (Červenka Peter, Železničná spoločnosť Cargo Slovakia a.s., SK)
• TSI Energy for convetional lines and their application not only within Railways of the Slovak Republic (Michalka Rastislav, ŽSR, SK)
• History and legal aspects of railway interoperability (Lauko Ladislav, Železnice Slovenskej republiky, SK)
• DISCUSSION |
| |
|
|
| |
|
SECTION II |
| |
|
|
| 13:30 - 15:30 |
|
BLOCK D1 (Carlton Hall)
Transportation policy and infrastructure of large urban agglomerations, their urbanism and integration of public passenger traffic |
| |
|
• Construction of integrated passenger transport infrastructure by means of OPD 2007-2013 (Peter Hrapko, MDPaT SR, SK)
• Junctions and lines of integrated transport in town structure (Ľubica Vitková, FA STU Bratislava, SK)
• Passengers traffic equipment standards in railway stations and stops out of European railway system (Karel Hájek, Martin Jacura, Lukáš Týfa, ČVUT v Praze, CZ)
• Current status in preparation of railway junction reconstruction in Brno (František Mráz, Jiří Pelc, SUDOP BRNO, s.r.o., CZ)
• New concept of transport junction Vienna Central Station (Erich Forster, ÖBB Personverkehr AG, A)
• DISCUSSION
|
| |
|
|
| 15:30 - 15:50 |
|
Break with refreshment |
| |
|
|
| 15:50 - 16:30 |
|
BLOCK D2 (Carlton Hall)
Transportation policy and infrastructure of large urban agglomerations, their urbanism and integration of public passenger traffic |
| |
|
• Railway transport transfer junctions for all: Universal design as new method of setting railway terminal environment (Pavol Korček, FA STU Bratislava, SK)
• Elastic grooved rail Bearning system: "RF" (Franciscus Vroegop, Ján Marček, Voestalpine, A)
• Spherolock NG-Totally enclosed locking system (Wolfgang Nayer, Ján Marček, Voestalpine, A) |
| |
|
|
| 16:30 - 17:50 |
|
BLOCK C2
Interoperability in railway transport |
| |
|
• Interoperability - Conformity assessment of interoperability constituent and subsystem verification (Peter Šišolák, Železnice Slovenskej republiky, SK)
• Additional Road Signalling for Increasing Safety at Railway Level Crossings (Aleš Janota, Rastislav Pirník, Zuzana Lobotková, FA EL ŽU, SK)
• Practical experience from the modeling of information systems and business processes (Jozef Majerčák, Ivan Nedeliak, Fakulta PEDAS ŽU, Železničná spoločnosť Cargo Slovakia, a.s., SK)
• Carriage extra shipments in international rail transport in terms of a European common market (Jozef Majerčák, Ján Lopata, FA PEDAS, ŽU, Železničná spoločnosť CARGO Slovakia, a.s., SK)
• Ways to increased in effectiveness of the railway freight transport (Peter Ihnát, Jozef Majerčák, Železničná spoločnosť CARGO Slovakia, a.s., FA PEDAS ŽU, SK)
• Approval precess of railway vehicle from tke point of view of the manufacturer (Marián Moravčík, Peter Tarajčák, Tatravagónka, a.s. Poprad, SK)
• Design and experiences with tube drain geocomposits somtube during construction of embankment bodies (Ján Trojan, Ján Hasenovič, Chémia-Servis, a.s.,SK)
• DISCUSSION |
| |
|
|
| 19:00 - 22:00 |
|
Social evening with a cultural program (Foyer)
Reception |
| |
|
|
| March 17, 2010 |
| |
|
|
| 08:30 - 09:00 |
|
Registration with refreshment |
| |
|
|
| 09:00 - 11:00 |
|
BLOCK B2 (Harmony Hall)
Modernization of conventional tracks and conditions for development of high speed tracks |
| |
|
• Static and dynamic calculation of Prístavný bridge in Bratislava (Ľubomír Turinič, Martin Hukel, PRODEX, spol. s r.o., SK)
• Design of urban public transport and railway traction lines crossing (Jiří Pelc, Jiří Košíček, SUDOP BRNO, s.r.o., CZ)
• Impact of the line base sag/summit design to traction line (Pavol Beňo, Juraj Cyprián, PRODEX, spol. s r.o., SK)
• Issue of sleeper subgrade structure design for adverse frost impact (Libor Ižvolt, Peter Kupčuliak, SvF ŽU Žilina, SK)
• Experiences from construction execution: Modernization of railway track Žilina - Krásno nad Kysucou (Klaudius Jančovič, Doprastav, a.s., SK)
• Modernization of railway track Praha - Kladno (Petr Zobal, Metroprojekt Praha, a.s., CZ)
• DISCUSSION |
| |
|
|
| 11:00 - 11:20 |
|
Break with refreshment |
| |
|
|
| 11:20 - 13:20 |
|
BLOCK B3 (Harmony Hall)
Modernization of conventional tracks and conditions for development of high speed tracks |
| |
|
• Two major railway bridges in Finland (Aarne Jutila, Extraplan Oy, FIN)
•
Railway tunnels Diel and Milochov, modernization of railway track Púchov - Žilina (Viktor Tóth, Beatrix Pribilová, Basler & Hofmann Slovakia s.r.o., SK)
• Villon simulation tool - studies in Slovak Republic (Peter Márton, Miloš Zaťko, Fakulta RI, ŽU Žilina, Simcon, s.r.o., SK)
• DISCUSSION |
| |
|
|
| 13:20 - 13:30 |
|
Conclusion of conference |
|